https://www.qatechies.com

Software Testing – ISQTB Questions – Part 26

istqb_questions

Software Testing Questions – Part 26


This Testing Question Bank “Software Testing Questions – Part 26” consists of High-Quality Multiple-Choice Questions (MCQ) on Software Testing Concepts.

These questions can range from basic concepts to advanced concepts of ISTQB Foundation and Test Analyst Level.

These Testing Questions are useful for manual as well as experienced QA Engineers in manual or automation and can be useful before appearing in any interview.


 

261. which of the following would be applicable as part of a test policy for testing these types of systems?

 

a) Systems must be tested for compliance to industry standard routing protocols.

b) Testing for the latest upgrade will require testing of increased network traffic of 12900.

c) Testing for the fix will require the use of dynamic analysis tools.

d) Releases will not be made if systems have any high priority defects outstanding.

 

A. a and b.

B. a and d.

C. band c.

D. band d.

 


262. Entry criterion for site acceptance testing for the air quality monitoring system?

 

A. That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested.

B. That the functional specification accurately reflects requirements R1 and R2.

C. That the system has been tested at levels of oxygen usage well beyond anticipated personnel levels.

D. That the requirements for temperature control have been signed-off.

 


263. Which one of the following test tools would you recommend for the E2E phase.

 

A. A configuration management tool to ensure that all user-stories have been properly archived.

B. A test design tool to create the test cases as efficiently as possible.

C. A performance test tool to check that anticipated loading can be handled.

D. A modeling tool to verify the stock exchange pricing structures.

 


264. Which two of the following measures would give the best indication of likely product quality?

 

a). Number of hours of overtime worked.

b). Number of test runs.

c). Coverage of requirements achieved.

d). Defect trends.

e). Budget sent so far.

 

A. a and c.

B. band d.

C. c and d.

D. d and e.

 


265. When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?

 

A. A walkthrough.

B. A technical review.

C. A management review.

D. A code inspection.

 


266. A failure is:

 

W) found in the software; the result of an error.
X) departure from specified behavior.
Y) an incorrect step, process or data definition in a computer program.
Z) a human action that produces an incorrect result.

 

 


267. In a system designed to work out the tax to be paid:

 

An employee has £3000 of salary tax free.
The next £1500 is taxed at 10%
The next £28000 is taxed at 22%
Any further amount is taxed at 40%

Which of these groups of numbers would fall into the same equivalence class?

(w) £4800; £14000; £18000
(x) £4200; £4500; £18000
(y) £18001; £22000; £25000
(z) £5800; £28000; £32000

 

 


268. The most important thing about early test design is that it:

(w) makes test preparation easier.
(x) means inspections are not required.
(y) can prevent fault multiplication.
(z) will find all faults.

 

 


269. Which of the following statements about reviews is true?

(w) Reviews cannot be performed on user requirements specifications.
(x) Reviews are the least effective way of testing code.
(y) Reviews are unlikely to find faults in test plans.
(z) Reviews should be performed on specifications, code, and test plans.

 

 


270. Test cases are designed during:

(w) test recording.
(x) test planning.
(y) test configuration.
(z) test specification.

 


If you prefer to continue reading more questions on Software Testing Interview or ISTQB Questions please follow below link for next set of questions:

Software Testing Questions — Main Page

 


If you would like to keep track of further articles on interview questions, I recommend you to SUBSCRIBE by Email and have new articles sent directly to your inbox.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

advanced-floating-content-close-btn
https://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js?client=ca-pub-5034726663464946 (adsbygoogle = window.adsbygoogle || []).push({});
advanced-floating-content-close-btn 
*************************** Do you want to learn TOSCA? Do you want to excel in Career? Try my New Courses: 1. Tricentis Tosca and Working with Excel   2. Tricentis Tosca and UI Automation Great News!!   Price has been slashed down for limited period of time.So Hurry!!! Click The Shown Links and Enjoy Learning. ***************************
 
error: Content is protected !!