Software Testing – ISQTB Questions – Part 23
January 7, 2019
Software Testing Questions – Part 23
This Testing Question Bank “Software Testing Questions – Part 23” consists of High-Quality Multiple-Choice Questions (MCQ) on Software Testing Concepts.
These questions can range from basic concepts to advanced concepts of ISTQB Foundation and Test Analyst Level.
These Testing Questions are useful for manual as well as experienced QA Engineers in manual or automation and can be useful before appearing in any interview.
231. Test Report’s three components are?
A. Description of Testing; resource requirement; and Recommendation
B. Testing requirements; defects; and usability
C. Description of test results and findings (defects), Summary (environment and references), and Recommendation
232. Non-Statistical tools are used in the
A. Benchmarking process
B. Work Practice process
C. Both A and B
D. None of the above
233. Scenario based question on Test Design Technique: Consider you want to evaluate how the oxygen is released at the required interval or time?
A. Decision Testing.
B. Statement Testing.
C. Data flow Testing.
D. Boundary Value Analysis.
234. Quality Function deployment (QFD) is a
A. Statistical tool
B. Non statistical tool
C. Development tool
D. None of the above
235. What is the difference between testing software developed by contractor outside your country, versus testing software developed by a contractor within your country?
A. Does not meet people needs
B. Cultural difference
C. Loss of control over reallocation of resources
D. Relinquishments of control
236. The Sequence of the four Phases involved in Bench marking process is
A. Action, Planning, Integration, Analysis
B. Planning, Analysis, Integration, Action
C. Analysis, Planning, Integration, Action
D. Analysis, Action, Planning, Integration
237. Risk is defined as
A. Probability * Influence
B. Occurrence * Risk Factor
C. Risk Factor * Risk Response Number
D. Frequency * Occurrence
238. A test completion’s quantitative measurement is used to determine?
A. Defect measurement
B. Requirements coverage
C. Statistical Analysis
239. Defect Management process does not include
A. Defect prevention
B. Deliverable base-lining
C. Management reporting
D. None of the above
240. A reliable website/application will be one that.
A. Is unlikely to be completed on schedule
B. Is unlikely to cause a failure
C. Is likely to be fault-free
D. Is likely to be liked by the users
If you prefer to continue reading more questions on Software Testing Interview or ISTQB Questions please follow below link for next set of questions:
Software Testing Questions – Part 24
Software Testing Questions — Main Page
If you would like to keep track of further articles on interview questions, I recommend you to SUBSCRIBE by Email and have new articles sent directly to your inbox.