Software Testing – ISQTB Questions – Part 12
January 7, 2019
Software Testing Questions – Part 12
This Testing Question Bank “Software Testing Questions – Part 12” consists of High-Quality Multiple-Choice Questions (MCQ) on Software Testing Concepts.
These questions can range from basic concepts to advanced concepts of ISTQB Foundation and Test Analyst Level.
These Testing Questions are useful for manual as well as experienced QA Engineers in manual or automation and can be useful before appearing in any interview.
121. Risk analysis is?
A. Evaluating risks
B. Evaluating vulnerabilities
C. Evaluating Controls
D. All of the above
122. Formal testing guidelines suggest which one of the following as the correct source of functional test cases?
A. The developers knowledge of what the software can do
B. The software design
C. The software requirements
D. The testers knowledge of what the software should do
E. The functional test procedures
123. _________ is responsible for conducting test readiness review?
A. Test manager
B. Test engineer
C. Both A & B
D. Project Manager
124. Risk control objectives are confirmed in______________
A. Design phase
B. Testing Phase
C. Requirement Phase
D. Implementation Phase
125. Which is not Testing Risk.
A. Budget
B. Number of qualified test resources
C. Sequence and increments of code delivery
D. Inadequately tested applications
126. If abnormal termination type X occurs 100 times per year, and the loss per occurrence is $900, then the loss associated with the risk is $90,000. Which methods of measuring the magnitude of risk I am using?
A. Judgment
B. Annual loss expectation estimation
C. Risk Formula
D. Consensus
127. What is Cascading error?
A. Unrelated errors
B. Triggers a second unrelated error in another part
C. A functionality could not be tested
D. Two similar errors
128. Configuration defects will be introduced if
A. Environment is not stable
B. Environment does not mirror test environment
C. Environment does not mirror production environment
D. All of the above
129. Quality Risk is
A. Complex technology used.
B. Incorrect result will be produced
C. Result of the system are unreliable
D. Requirement comply with methodology
130. Method of conducting Risk Analysis is
A. User your judgment
B. User your instinct
C. Cost of failure
D. All of the above
If you prefer to continue reading more questions on Software Testing Interview or ISTQB Questions please follow below link for next set of questions:
Software Testing Questions – Part 13
Software Testing Questions — Main Page
If you would like to keep track of further articles on interview questions, I recommend you to SUBSCRIBE by Email and have new articles sent directly to your inbox.